Standalone: The new way forward in non-domestic ventilation
Contents |
[edit] Introduction
Bars, restaurants and leisure venues are opening. Schools have welcomed back pupils. People are heading back into work. But what, in the building services and ventilation sector, will be our new normal? One thing is already clear - things are going to change.
[edit] New building regulations
We have building regulations revisions imminent that will change the way we design ventilation strategies. The ingress of external pollutants should be minimised. Ductwork should be rigid, not flexible and lengths kept to a minimum.
Approved Document Part F is looking for not just a commissioning report to show the system works adequately, but information in operation and maintenance. The interim uplift for Approved Document Part L is looking for a 27% reduction in carbon emissions per building against the existing standard.
Inevitably, protecting against COVID-19, even despite the vaccination programme, will figure in specifiers’ minds. With the best will in the world, the initial Government guidance to achieve adequate ventilation re COVID-19 of “opening windows” is not practical nor realistic as a long-term strategy alongside the global drive to cut carbon emissions and improve indoor air quality (IAQ).
[edit] System evolution
Whereas on the face of it, the industry is facing a huge amount of change, the wherewithal to deliver is already widely available and in use. Legislation is just confirming what the quality manufacturers and engineers already implement. It all combines to, I believe, an increasing use of standalone ventilation and heat recovery systems, especially those that minimise energy usage.
The latest evolution has been a hybrid-dynamic optimisation of natural ventilation, fan boosted mechanically when required. Ahead of the changes to building regulations, standalone versions have already been developed. Are these the way forward to meet our requirements?
Some hybrid systems, such as units designed to meet current regulatory guidance (eg. BB101 for schools), are standalone single-zone items, which obviates the need for ductwork, either to external or internal areas. No internal penetrations are required either, to move the air through the building, as each unit serves a dedicated zone, whether façade- or ceiling-mounted. This reduces major cost and labour in ductwork, fire dampers and silencers.
The principle therefore already overcomes the potential obstacles when the revised Approved Document F comes into force. They ventilate just the one space, preventing transfer of particulates from one zone to another and thereby minimise risk of internal cross contamination. Some already deliver flow rates compliant with latest COVID-19 guidance (i.e. to achieve a notional carbon dioxide (CO2) below 1000ppm.
CO2 is currently the metric used to check the air is ‘fresh’ within a zone. Links have been established that higher CO2 levels reflect higher COVID-19 risk.
[edit] Modular design
Within modular design products, these can be provided alongside a “mix and match” option of additions. These can be added to meet the specific use and requirements of the buildings to be ventilated.
Some options include:
- Filter modules to address fine airborne particles and maintain the IAQ within required limits.
- Connection modules to address site-specific installation limitations to allow single-sided operation.
- Heating coils that can remove the need for ancillary supplementary heating such as radiators.
- Acoustic attenuation to modulate noise below 30dBA.
- Control unit to enable easy management of the IAQ and temperature to facilitate any over ride as required. This provides capable boost and purge ventilation and night time cooling.
[edit] Get it right
The amount of change, not just in regulations, but how we use our non-domestic buildings in the future, is vast. Specifiers and designers should use the expertise of product manufacturers to their advantage. It is wise to tap this knowledge bank to ensure delivery of the best, most compliant solution for the project.
This article originally appeared on the BSRIA Blog. It was written by BSRIA member Roy Jones, Technical Director at Gilberts (Blackpool) Ltd. and published on 5 October 2021.
--BSRIA
[edit] Related articles on Designing Buildings
- Air tightness.
- Approved documents.
- Approved Document F.
- Approved document L.
- Back to the workplace: are you prepared?
- BSRIA articles on Designing Buildings Wiki.
- Building Regulations.
- Building ventilation and COVID-19 transmission risk.
- IAQ developments accelerated by COVID-19.
- Indoor air quality.
- Single-sided ventilation.
- Ventilation.
- Ventilation and control of COVID-19 transmission.
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.